Upcoming projects to the HAM portfolio
Hasanpur Bakhtiyarpur Highway Private Limited
The project is for Four-Laning of the Rajauli – Bakhtiyarpur section of NH-31 (New NH-20) from Km 101+630 to Km 152+520 (Package – III) on Hybrid Annuity Mode in the state of Bihar. The project starts from Hasanpur and ends at Bakhtiyarpur, with a total length of 50.890 km. It was awarded by NHAI on 14th September 2020, and the Concession Agreement was signed on 28th October 2020. The project is near completion, and provisional completion is in process.
Korba Highway Private Limited
The project is for Four-Laning of Champa – Korba – Katghora section of NH-149B from design ch. 0+000 to ch. 38+200 (from NH-49 near Saragaon village to Bhaisma village) under NH(O) in the state of Chhattisgarh on Hybrid Annuity Mode. It was awarded by NHAI on 25th March 2021, and the Concession Agreement was signed on 7th June 2021. The project achieved provisional completion in March 2024.
Gawar Kangra Highways Private Limited
The project is for the rehabilitation and upgrading of the existing 2-lane to 4-lane from Bhangbar (near Ranital) to the Kangra Bypass section of NH-88 (New NH-303,503) up to the intersection with NH-154 (Design Chainage – Km 175+270 to Km 193+400, Design Length – 18.130 km) in the state of Himachal Pradesh under NH (O) on HAM Mode (Package-VB). It was awarded by NHAI on 12th April 2021, and the Concession Agreement was signed on 22nd June 2021. More than 75% physical progress has been completed, and the project is expected to be completed by Dec 2024/Jan 2025.
Gawar Pathankot Mandi Highway Private Limited
The project is for the rehabilitation and upgradation to a four-lane configuration & strengthening of Mo to Sihuni from Km 42.000 to Km 51.000 (Design Length 8.330 km) of NH-20 (New NH-154) of the Pathankot-Mandi section in the state of Himachal Pradesh on Hybrid Annuity Mode (HAM) (Package-IB). It was awarded by NHAI on 24th May 2021, and the Concession Agreement was signed on 8th July 2021. The project is near completion with physical progress of more than 97%.
Gawar Sihuni Highway Private Limited
The project is for the rehabilitation and upgradation to a four-lane configuration & strengthening of Sihuni to Rajol from Km 51.000 to Km 72.000 of NH-20 (New NH-154) (Design Length 18.450 km) of the Pathankot-Mandi section under NH(O) in HP on a HAM basis (Package-IIA). It was awarded by NHAI on 25th March 2022, and the Concession Agreement was signed on 9th May 2022. Financial closure was achieved on 26th September 2022, and the Appointed Date was declared with effect from 27th September 2023. The project is in the construction stage and progressing as per schedule.
Gawar Shimla Highway Private Limited
The project is for the construction of the four-laning of NH-5 from Shakral Village to Dhalli Section (Shimla Bypass Package II: from Km 146.300 to Km 156.560 and Shimla connectivity from Km 0.000 to Km 0.725 for Design Length = 10.985 km) in Himachal Pradesh on Hybrid Annuity Mode. It was awarded by NHAI on 11th July 2022, and the Concession Agreement was signed on 10th August 2022. Financial closure was achieved on 2nd January 2023, and the Appointed Date was declared with effect from 4th March 2024. The project is in the initial stage of construction and progressing as per schedule.
Gawar Pathankot Highways Private Limited
The project is for the rehabilitation and upgradation to a two-lane with paved shoulder configuration & strengthening of the Padhar to Bijni section from Km 180.000 to Km 202.815 of NH-154 (Design Length – 19.050 km) of the Pathankot-Mandi section under NH(O) in Himachal Pradesh on HAM Basis (Package-V A). It was awarded on 20th July 2022, and the Concession Agreement was signed on 25th August 2022. Financial closure was achieved on 13th January 2023. The Appointed Date is awaited.
Gawar Bhiwani Highway Private Limited
The project is for the four-laning of the Bhiwani-Hansi road section of NH-148B (Design Length 42.934 km) under Bharatmala Pariyojana in the state of Haryana on Hybrid Annuity Mode. It was awarded by NHAI on 7th March 2023, and the Concession Agreement was signed on 21st April 2023. Financial closure was achieved on 7th September 2023, and the Appointed Date was declared with effect from 17th December 2023. The project is in the construction stage and progressing as per schedule.
Gawar Fazilka Highway Private Limited
The project is for the four-laning of Abohar (Design chainage 75.500, Existing Km. 49+070 of NH-07) to Fazilka (Design chainage 114.080, Existing Km. 80+655 of SH-20) and the construction of a four-lane Greenfield highway of Abohar bypass (from Design chainage 0.000, Existing Km 58+230, Malout-Abohar Road on NH-07 to Design chainage 6.380, Existing Km 42+305, Abohar-Fazilka Road on NH-07) (Total design length = 44.96 km) on HAM Mode in the state of Punjab under Bharatmala Pariyojana. It was awarded by NHAI on 23rd March 2023, and the Concession Agreement was signed on 12th May 2023. Financial closure was achieved on 26th September 2023. The Provisional Appointed Date was declared with effect from 13th April 2024, and the Final Appointed Date is awaited. The project is in the construction stage and progressing as per schedule.
Gawar Basukinath Highways Private Limited
The project is for the Four-Laning of the Basukinath-Deoghar Section of NH 114A from Km 85+081 to Km 130+240 on NH-114A under NHDP Phase-IV in the state of Jharkhand on Hybrid Annuity Mode. It was awarded by NHAI on 17th March 2023, and the Concession Agreement was signed on 11th May 2023. Financial closure was achieved on 30th September 2023, and the Appointed Date was declared with effect from 12th December 2023. The project is in the construction stage and progressing as per schedule.
JRR Highways Private Limited
The project is for the Four-Laning of Dangiawas (km 96.595 of NH-112) to Jajiwal (km 283.500 of NH-65 Nagaur Road) Section – Package-I (Design length 74.619 km) of Jodhpur Ring Road (In Principle declared NH) in the state of Rajasthan on Hybrid Annuity Mode under NHDP Phase VII. The project was acquired by the company through an Endorsement Agreement dated 13th July 2022. The project is near completion, and Provisional Completion was declared in April 2024.
Gawar Waranga Highways Private Limited
The project is for the Four-Laning of the Waranga-Mahagaon section of NH-361 from Km 253.700 to Km 320.580 (Pkg. -1) (Design Length 66.880 km) under NHDP Phase-IV on Hybrid Annuity Mode in the state of Maharashtra. The project was acquired by the company through an Endorsement Agreement dated 6th October 2023. The project is near completion and progressing as per schedule.
Gawar Bijnor Highways Private Limited
The project is for the Four-Laning of the Behsuma – Bijnor section of NH-119 (New NH-34) from Design Ch. 39.250 km (Existing chainage 39/240) to Design Ch. 78.810 km (Existing chainage 89/590) with a Design Length of 39.560 km in the state of Uttar Pradesh on Hybrid Annuity Mode under Bharatmala Pariyojna. It was awarded by NHAI on 29th March 2023, and the Concession Agreement was signed on 16th May 2023. Financial closure was achieved on 22nd September 2023, and the Appointed Date was declared with effect from 18th May 2024. The project is in the construction stage and progressing as per schedule.
Gawar Rudrapur Highway Private Limited
The project is for the construction of the Rudrapur Bypass Section from Km 0.000 to Km 20.640 in the states of Uttar Pradesh and Uttarakhand on Hybrid Annuity Mode. It was awarded by NHAI on 29th March 2023, and the Concession Agreement was signed on 18th May 2023. Financial closure was achieved on 26th September 2023, and the Appointed Date was declared with effect from 12th January 2024. The project is in the construction stage and progressing as per schedule.
Gawar Mandi Highways Private Limited
The project is for the construction of Four-Laning with a Paved Shoulder of the Bijni to Mandi section from existing Km 202.815 to Km 208.000 of NH-20 (New NH-154) (Design Length 5.357 km), including the construction of a Twin Tube Tunnel for a length of 3.500 km of Pathankot-Mandi under NH(O) in Himachal Pradesh on Hybrid Annuity Mode basis (Package-VB). It was awarded by NHAI on 16th October 2023, and the Concession Agreement was signed on 29th November 2023. Financial closure was achieved on 18th April 2024. The Appointed Date is awaited.
Gawar KBNC Highway Private Limited
The project is for the rehabilitation and upgrading of the existing road from Kalar Bala Village to Nauni Chowk of NH 205 for Four-Laning with a Paved Shoulder (Design Chainage – Km 41+000 to Km 58+450, Design Length ‐ 17.450 km), Package‐IIC in the state of Himachal Pradesh under NH (O) on Hybrid Annuity Mode. It was awarded by NHAI on 8th March 2024, and the Concession Agreement was signed on 16th May 2024. Financial closure is in progress.